Asbestos floor tile and mastic removal in Auburn, Washington

Typical cost in Auburn

  • One bathroom or laundry floor, about 50 to 100 sq ft$1,200 – $3,000+
  • One kitchen or large room, about 150 to 300 sq ft$1,800 – $5,000+
  • Several rooms, about 500 to 1,000 sq ft$4,000 – $12,000+

Old vinyl tile often comes up before a kitchen or bath remodel, and the adhesive and backing under it matter as much as the tile. We treat each layer separately, so you know what comes out and how the floor is left for the new flooring.

We pull up old floors in Algona and Pacific as well as Auburn. When you call, give us the address and the rooms that are changing; that decides how we set up.

Tell us about your project
Nine-inch vinyl floor tiles and black mastic partly exposed in an older kitchen

Asbestos floor tile and mastic removal by floor type

Resilient floor tiles

Tile size and color will not tell you whether there is asbestos in it. Let us know whether the floor has ever been covered over or patched. We test the tile, then remove only the surveyed areas and leave the subfloor in place, instead of treating every similar-looking floor as the same material.

Adhesive and black mastic

The glue under a tile is tested on its own. Pulling up the tile can leave adhesive behind, and that matters to whoever lays the new floor. Our quote says whether the adhesive comes off too and how clean the subfloor will be before the flooring installer starts prep work.

Sheet flooring and backing

Older sheet vinyl can have a backing layer that is a different material from the surface on top. Let us know if cabinets, walls or newer flooring cover part of the old floor. Our testing and removal follow the work, including spots that open up as it goes, rather than stopping at the easiest edge.

Layered floors and transitions

Doorways, additions and remodeled kitchens can have several floors stacked up. We map where the materials change, whether the work runs under the cabinets and how the new floor heights will meet. Planning room by room keeps us from finding an untested layer after demolition has started.

How we leave the floor

We agree with your flooring installer, up front, what "done" means. When we finish, the area is clean, but the subfloor may not be flat or dry enough for the new floor. Before work starts, we settle who handles subfloor repairs, leveling and the moisture check. Never grind, sand or scrape suspect adhesive before it has been tested.

Survey and project requirements in Washington

Puget Sound Clean Air Agency rules differ for remodels and for demolition. Removing vinyl tile and its adhesive needs no agency notice, but we still check the survey and where the waste goes before we lift a tile.

If the ceiling or siding comes off too, see our other asbestos services.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (253) 294-7929

Call (253) 294-7929