How we leave the floor
We agree with your flooring installer, up front, what "done" means. When we finish, the area is clean, but the subfloor may not be flat or dry enough for the new floor. Before work starts, we settle who handles subfloor repairs, leveling and the moisture check. Never grind, sand or scrape suspect adhesive before it has been tested.
Survey and project requirements in Washington
Puget Sound Clean Air Agency rules differ for remodels and for demolition. Removing vinyl tile and its adhesive needs no agency notice, but we still check the survey and where the waste goes before we lift a tile.
If the ceiling or siding comes off too, see our other asbestos services.